Health and Safety Requirements for Contractors
Malhi Capital Holdings Ltd trading as MCI · Version 1.0 · November 2026
These requirements apply to all construction, refurbishment, maintenance and repair work carried out for Malhi Capital Holdings Ltd, trading as MCI, company number 14943725 (MCI). They form part of the contract between MCI and each contractor (the Contractor) and should be read with MCI's Contractor Terms and Conditions.
Their purpose is that nobody is harmed by the work, and that every building is safe to use and maintain when the work is finished.
1. The law that applies
The Contractor will comply with all health and safety law that applies to its work, including:
the Health and Safety at Work etc. Act 1974 and the Management of Health and Safety at Work Regulations 1999;
the Construction (Design and Management) Regulations 2015 (CDM 2015);
the Work at Height Regulations 2005;
the Control of Asbestos Regulations 2012;
the Control of Substances Hazardous to Health Regulations 2002;
the Gas Safety (Installation and Use) Regulations 1998 and the Electricity at Work Regulations 1989;
the Regulatory Reform (Fire Safety) Order 2005;
the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 (RIDDOR); and
the Building Safety Act 2022 and the dutyholder and competence requirements in Part 2A of the Building Regulations 2010.
2. MCI's duties as client
MCI is a commercial client under CDM 2015 and accepts the duties that come with that role. MCI will:
make suitable arrangements for managing each project, including allowing enough time and resources;
appoint a principal designer and a principal contractor in writing where more than one contractor will work on a project;
take reasonable steps to check that those it appoints are competent;
provide the pre-construction information it holds, including any asbestos survey;
make sure a construction phase plan is in place before work starts and that welfare facilities are provided;
notify the Health and Safety Executive where a project will last longer than 30 working days and have more than 20 workers on site at the same time, or will exceed 500 person days of work; and
keep the health and safety file and make it available to anyone who needs it for later work.
Where MCI has not appointed a principal designer or principal contractor in writing, the law treats MCI as holding that role. The written order for the work (the Order) will state who holds each role on the project.
MCI is not expected to manage or supervise the Contractor's work, and the Contractor remains responsible for how its own work is carried out.
3. Duties of every contractor
Every Contractor will:
plan, manage and monitor its own work so that it is carried out safely;
prepare suitable risk assessments and method statements before starting, and give copies to MCI or the principal contractor on request;
use only workers who are competent, trained and properly supervised, and make sure each receives a site induction;
follow the construction phase plan and the directions of the principal contractor;
where it is the only contractor on a project, prepare the construction phase plan before work starts;
provide suitable protective equipment and make sure it is used;
co-operate with MCI, the principal designer, the principal contractor and other contractors, and co-ordinate its work with theirs;
prevent unauthorised access to its work area; and
report to MCI or the principal contractor anything likely to endanger health or safety.
4. Additional duties of a principal contractor
Where the Order appoints the Contractor as principal contractor, the Contractor will also:
plan, manage, monitor and co-ordinate the whole construction phase;
prepare the construction phase plan before work starts and keep it up to date;
secure the site and provide site inductions;
provide suitable welfare facilities from the start of the work;
consult and engage with workers on health and safety;
liaise with the principal designer and provide the information needed for the health and safety file; and
plan, manage and monitor the building work so that it complies with the Building Regulations.
5. Specific risks
The Contractor confirms that it has the experience and competence to manage the risks of its work, and will in particular control the following.
Work at height: avoid it where possible, and otherwise use suitable access equipment and edge protection.
Asbestos: review the asbestos information before starting. Stop work immediately and tell MCI if suspect material is found. Only a licensed contractor may carry out licensable asbestos work.
Structures and excavations: have temporary works designed and checked by a competent person, and support excavations.
Dust: control dust at source and provide suitable respiratory protection.
Electricity and gas: isolate services before work. Only suitably qualified electricians may carry out electrical work, and only Gas Safe registered engineers may work on gas.
Fire: control hot works, keep escape routes clear and provide fire-fighting equipment. Do not disable any fire alarm, fire door or emergency light without MCI's agreement and interim measures in place.
Hazardous substances, noise and vibration: assess and control exposure.
Manual handling and lifting: plan lifts and use suitable equipment.
The public and occupiers: separate the work from occupiers, neighbours and passers-by, and keep access routes safe.
6. Occupied properties
Many MCI properties remain occupied during work. In an occupied property the Contractor will also:
agree working hours, access and the storage of materials with MCI before starting;
keep shared areas, stairs and escape routes clear and clean at all times;
keep the property secure, and control keys and access codes; and
leave water, heating, power and fire protection working at the end of each day, or agree alternative arrangements with MCI in advance.
7. Accidents and incidents
The Contractor will tell MCI on the same day about any accident, near miss, dangerous occurrence, damage to property, or visit or notice from an enforcing authority that relates to its work.
The Contractor will make any report that RIDDOR requires for its own workers, give MCI a copy, co-operate with any investigation and keep relevant evidence.
8. Inspection and stopping work
MCI may inspect the work, ask for health and safety documents, and require the Contractor to stop any work or remove any person that MCI reasonably considers unsafe.
An inspection or instruction by MCI does not transfer the Contractor's responsibilities to MCI. The Contractor is not entitled to extra time or money for a stoppage caused by its own breach.
9. Documents at completion
When its work is complete, the Contractor will give MCI the information needed for the health and safety file, including as-built information, certificates, test results, and operating and maintenance instructions.
10. Responsibility
Each party is responsible for its own duties under health and safety law. Those duties cannot be transferred by contract, and nothing in these requirements limits liability for death or personal injury caused by negligence.
The Contractor is responsible for the health and safety of its workers and of anyone affected by its work. To the extent the law allows, the Contractor will reimburse MCI for losses, costs and claims that result from the Contractor's breach of these requirements or of health and safety law, including the cost of delay and of putting work right.
A serious breach of these requirements entitles MCI to end the contract under the Contractor Terms and Conditions.
Contractors are asked to sign a copy of this document before starting work. To request a copy for signature, email hello@mci.co.uk.