MCI logo Investment · Development · Advisory

Contractor Terms and Conditions

Malhi Capital Holdings Ltd trading as MCI · Version 1.0 · November 2026

These terms apply to every contract under which a contractor, subcontractor, tradesperson, consultant or supplier (the Contractor) carries out work or provides services for Malhi Capital Holdings Ltd, trading as MCI, a company registered in England and Wales with company number 14943725 (MCI).

The Contractor accepts these terms by signing them, by confirming an order in writing, or by starting work, whichever happens first.

1. The contract

1.1

The contract between MCI and the Contractor (the Contract) is made up of the following documents. If they conflict, the document higher in the list takes priority.

(a)

the scope, price and programme agreed in writing between MCI and the Contractor, including by email or text message (the Order);

(b)

these terms;

(c)

MCI's Health and Safety Requirements for Contractors; and

(d)

MCI's Confidentiality Agreement.

1.2

These terms apply in place of any terms the Contractor supplies or refers to, however and whenever they are communicated.

1.3

A change to the Contract is binding only if a director of MCI, or a person MCI has authorised in writing, agrees it in writing. Email is sufficient.

1.4

MCI enters the Contract for itself and for the benefit of any company in its group that owns, occupies or funds the property where the work takes place (the MCI Group).

2. The services

2.1

The Contractor will carry out the work and services described in the Order, and anything reasonably incidental to them (the Services).

2.2

The Contractor will carry out the Services:

(a)

with the skill and care expected of a competent contractor experienced in work of the same kind;

(b)

in line with the Order, the drawings and specification, any planning permission, the Building Regulations, manufacturers' instructions and relevant British Standards;

(c)

using new materials of satisfactory quality that are fit for their purpose, unless MCI agrees otherwise in writing; and

(d)

in compliance with all laws that apply to the Services.

2.3

Where the Services relate to a dwelling, the Contractor will carry them out in a workmanlike or professional manner and with proper materials, so that the dwelling is fit for habitation when the Services are complete.

2.4

The Contractor confirms that it, and everyone it uses, has the skills, knowledge, experience and behaviours needed to carry out the Services in compliance with the Building Regulations, and holds every registration the work requires (for example Gas Safe registration, or membership of a competent person scheme for electrical work). The Contractor will provide evidence when MCI asks for it.

2.5

The Contractor will obtain and hand to MCI every certificate, warranty, test result and manual that relates to the Services, including gas safety, electrical installation and building control certificates. The Services are not complete until MCI has received them.

2.6

MCI will not pay for additional or varied work unless it agreed the scope and price in writing before that work was carried out.

3. Programme and delay

3.1

The Contractor will start and complete the Services by the dates in the Order. If the Order gives no dates, the Contractor will complete the Services within a reasonable time and will work regularly and diligently until they are complete.

3.2

The Contractor will tell MCI in writing as soon as it becomes aware of any delay and its cause.

3.3

MCI will allow a fair extension of time where delay is caused by MCI, by a variation MCI instructs, or by an event beyond the Contractor's reasonable control. Shortage of the Contractor's own labour, materials or funds is not such an event.

3.4

If the Contractor does not complete the Services on time, it will pay MCI the losses that the delay causes, including the reasonable cost of others completing the work, additional finance costs and lost rent. If the Order states a rate of liquidated damages, that rate applies instead.

4. Price and payment

4.1

The price is the fixed price stated in the Order. It includes all labour, materials, plant, travel and expenses unless the Order says otherwise, and excludes VAT.

4.2

The Contractor may apply for payment when it completes each stage set out in the Order. If the Order sets out no stages, the Contractor may apply once every 28 days for the value of the work properly carried out.

4.3

Each application must be in writing, state the sum the Contractor considers due and how it is calculated, and include reasonable evidence that the work is complete.

4.4

The payment due date is 7 days after MCI receives a valid application.

4.5

MCI will give the Contractor a payment notice no later than 5 days after the payment due date, stating the sum MCI considers due and how it is calculated. If MCI gives no payment notice, the Contractor's application is treated as the payment notice.

4.6

The final date for payment is 14 days after the payment due date.

4.7

If MCI intends to pay less than the notified sum, it will give the Contractor a pay less notice no later than 7 days before the final date for payment, stating the sum MCI considers due and how it is calculated. MCI may pay less to reflect defective or incomplete work, the cost of putting work right, losses caused by delay, and any other sum the Contractor owes MCI.

4.8

MCI holds no retention unless the Order says so.

4.9

If MCI does not pay a sum by the final date for payment, the Contractor may charge interest on the overdue sum at 4% a year above the Bank of England base rate, or at any higher rate the law requires.

4.10

If MCI does not pay a notified sum in full by the final date for payment and no pay less notice has been given, the Contractor may suspend the Services after giving MCI at least 7 days' written notice stating the reason.

4.11

MCI will verify the Contractor with HMRC under the Construction Industry Scheme where it applies, and will make any deduction the scheme requires. The Contractor will give MCI the details needed to do so.

4.12

The Contractor will issue a valid VAT invoice where VAT applies and is responsible for applying the correct VAT treatment, including the domestic reverse charge for construction services. MCI will confirm its end user status on request.

4.13

The Contractor is an independent business. It is responsible for all tax and National Insurance on what it is paid, and for all pay, tax, National Insurance and benefits due to the people it uses. The Contractor will reimburse MCI for any such sum that MCI is required to pay.

5. Defects

5.1

For 12 months after the Services are complete, or any longer period stated in the Order, the Contractor will return and put right at its own cost any defect in the Services within 7 days of MCI's written notice. Where the defect affects safety, security, water, heating or power, the Contractor will attend within 24 hours.

5.2

If the Contractor does not put a defect right in time, MCI may have others do so and recover the reasonable cost from the Contractor.

5.3

This section does not limit any other right MCI has in relation to defective work.

6. Site and conduct

6.1

The Contractor will comply with MCI's Health and Safety Requirements for Contractors and with all health and safety law.

6.2

The Contractor will provide at its own cost all tools, plant, equipment, materials and protective equipment needed for the Services, and will keep them safe and in good order.

6.3

Materials become MCI's property when they are paid for or fixed to the property, whichever is earlier. The Contractor carries the risk of loss or damage to the works and materials until the Services are complete.

6.4

The Contractor will keep the site secure and tidy, protect the existing building and neighbouring property, and make good any damage it causes.

6.5

The Contractor will remove waste lawfully, using a registered waste carrier, and will give MCI copies of waste transfer notes on request.

6.6

Many MCI properties are occupied. In an occupied property the Contractor and its people will carry identification, work only at the times agreed with MCI, enter private rooms only by arrangement with MCI, treat occupiers with courtesy, and will not smoke, drink alcohol or use drugs on site.

7. Insurance

7.1

The Contractor will hold the following insurance with a reputable insurer and will show MCI evidence on request:

(a)

public liability insurance of at least £2,000,000 for any one claim, or any higher amount stated in the Order;

(b)

employers' liability insurance of at least £5,000,000 where the Contractor has employees;

(c)

insurance for its tools, plant, the works in progress and unfixed materials; and

(d)

professional indemnity insurance where the Services include design or professional advice, at the level stated in the Order or, if none is stated, at least £250,000, maintained for 6 years after the Services are complete.

8. People and subcontracting

8.1

The Contractor may use subcontractors but remains fully responsible for their work and conduct. The Contractor may not subcontract the whole of the Services, or transfer the Contract, without MCI's written consent.

8.2

The Contractor will make sure that everyone it uses is competent, properly supervised and has the right to work in the United Kingdom.

8.3

Nothing in the Contract makes the Contractor or its people employees, workers, agents or partners of MCI. The Contractor decides how it carries out the Services, subject to the Contract, and is free to work for others.

9. Legal compliance

9.1

The Contractor will comply with all laws on bribery, fraud, tax evasion, modern slavery, immigration and equality, and will not offer or accept any improper payment or benefit in connection with the Contract.

9.2

Where the Contractor receives personal information about occupiers, MCI's staff or others in connection with the Services, it will use that information only for the Services, keep it secure, delete it when the Services are complete, and tell MCI within 24 hours if it is lost or misused.

10. Confidentiality and intellectual property

10.1

MCI's Confidentiality Agreement applies to the Contract. The Contractor will not publish photographs of any MCI property, or name MCI or its properties in any advertising or on social media, without MCI's written consent.

10.2

All drawings, designs, specifications, reports and other documents the Contractor produces for MCI under the Contract belong to MCI from the moment they are created, and the Contractor assigns all rights in them to MCI. The Contractor waives any moral rights in them.

10.3

The Contractor keeps ownership of materials it created before the Contract and grants MCI a permanent, free licence to use them in connection with the property.

10.4

The Contractor confirms that the Services and the documents it produces will not infringe anyone else's rights.

10.5

When the Services end, the Contractor will return all keys, documents and other property belonging to MCI.

11. Liability

11.1

Nothing in the Contract limits or excludes either party's liability for death or personal injury caused by negligence, for fraud, or for anything else that cannot be limited or excluded by law.

11.2

The Contractor will reimburse MCI and the MCI Group for all losses, claims and reasonable costs that arise from the Contractor's breach of the Contract, negligence or breach of statutory duty, including claims by occupiers, neighbours and other third parties.

11.3

Subject to the first clause of this section, MCI's total liability to the Contractor in connection with the Contract, other than for the price properly due, is limited to the price payable under the Order, and MCI is not liable for loss of profit or for any indirect loss.

12. Ending the contract

12.1

MCI may end the Contract immediately by written notice if the Contractor:

(a)

commits a material breach and does not put it right within 7 days of MCI's written notice, or commits a breach that cannot be put right;

(b)

repeatedly carries out defective work;

(c)

stops work without good reason for 5 working days;

(d)

commits a serious breach of health and safety requirements;

(e)

breaches the section headed Legal compliance;

(f)

loses a registration or insurance that the Services require; or

(g)

becomes insolvent or unable to pay its debts.

12.2

MCI may also end the Contract at any time on 7 days' written notice. In that case MCI will pay for the work properly carried out and the materials properly delivered up to the end date, and nothing more.

12.3

If MCI ends the Contract because of the Contractor's default, MCI may have the Services completed by others. Once the cost of completion is known, MCI will prepare an account. If the cost of completion and MCI's other losses exceed the unpaid balance of the price, the Contractor will pay MCI the difference. If they are less, MCI will pay the Contractor the remaining balance. MCI will give any notice the law requires before withholding payment.

12.4

The Contractor may end the Contract if MCI has not paid a sum that is due and undisputed within 14 days of the Contractor's written notice requiring payment, given after the final date for payment.

12.5

The clauses on defects, insurance, confidentiality, intellectual property, liability and disputes continue to apply after the Contract ends.

13. Disputes

13.1

The parties will first try to settle any dispute by discussion between the Contractor and a director of MCI within 14 days of one party raising it in writing.

13.2

Either party may refer a dispute under the Contract to adjudication at any time under the Scheme for Construction Contracts (England and Wales) Regulations 1998. If the parties do not agree an adjudicator, the Royal Institution of Chartered Surveyors will nominate one.

13.3

The Contract is governed by the law of England and Wales. Subject to the right to adjudicate, the courts of England and Wales have exclusive jurisdiction over any dispute connected with it.

14. General

14.1

Notices under the Contract must be in writing. Notices to MCI must be sent by email to hello@mci.co.uk or by post to MCI's registered office as recorded at Companies House. Notices to the Contractor may be sent to the email or postal address the Contractor has used in connection with the Order. An email is treated as received on the next working day.

14.2

The Contract is the whole agreement between the parties about the Services. Neither party has relied on any statement that is not set out in it. This does not exclude liability for fraud.

14.3

Companies in the MCI Group, and any lender that funds the property, may enforce the Contract. No other third party may do so.

14.4

Within 14 days of MCI's request, the Contractor will sign a collateral warranty in a reasonable standard form in favour of any lender, purchaser or tenant of the property.

14.5

MCI may transfer the Contract to a company in the MCI Group, a lender or a purchaser of the property.

14.6

If any part of the Contract is found to be unenforceable, the rest continues to apply. A delay in enforcing a right is not a waiver of it.

Contractors are asked to sign a copy of this document before starting work. To request a copy for signature, email hello@mci.co.uk.